Design and Delivery of your STP
Our sales team members based on your inputs give relevant information for design and design team support you in with our inputs to what should be the size of the wastewater treatment plant, its performance and other relevant information. An inception report can be submitted on needs basis.
Most customers and their consultants although know the sizing of the plant, it is quite often the case that some information is missing in basic consideration. To ensure that we give you the right plant that works for you now and also in the future, we take the extra effort to ask you some basic questions to get the right design parameters for your wastewater and sewage treatment plant.
KLD usually means the water usage, while the physical, biological and chemical parameters in the sewage change based on the building type, type of users and occupancy, etc. For example resorts, hotels, commercial buildings, schools, hostels, commercial kitchen, and hospitals need special design consideration.
Training For Plant Operator And Owners
EcoTec customers, owners of EcoTec plant and its operators are trained by our technicians on plant operation, trouble shooting and maintenance. Our operation and maintenance manual is an all in one reference document that give you full explanation of plant operation, service, maintenance. Sampling procedures and analysis of performance can also be done by referring to EcoTec operation and maintenance manual.
The operator can be trained on following,
- Sampling procedure for testing BOD, COD, NH4 and P
- Jar test SVI, activated sludge and sludge age analysis
- Sludge digestion and it is wasting procedure
- Operational parameters optimisation- energy saving through plant operation adjustments
- Measurements of parameters like 02, pH, DO, etc.
Training For Plant Operator And Owners
Once we have agreed with you on the concept, with the inlet levels, invert levels and the location of the wastewater treatment plant a detailed design is given to you. It is always important for us to have understood your project to give you the right design. On agreement with your competent representatives (consultants), drawings with actual levels are considered and drawings are shared with you.
Project Management Support During Construction
On request and on needs basis site visits are carried out during construction of the tanks and corrective measures are advised as per site conditions.
Equipment Fabrication And Supply
Based on the design our production department manufactures the process equipment in our factory in Chennai. All parts, components and equipments are quality tested by our competent engineers and technicians.
Installation, Commissioning And Plant Start-Up Support
EcoTec trained professional are always there for installation supervision of the plant. Each installation is complete after conducting performance test for each part, component and equipment. Commissioning and plant start up is the easiest part of EcoTec plants, it happens with just switching on the plant. Performance of the plant stabilizes in 30-40 days from the day of plant start up.